Training Course Seminar Workshop Provider

Management, Technical, Public, Inhouse Training

  • Increase font size
  • Default font size
  • Decrease font size

Well Completion and Workover (PRC-2)

E-mail Print

OBJECTIVES

This course introduces the participants to the concepts of completions and workover designs. It introduces the participants to the common completion and stimulation methods and the associated oil field equipments.

COURSE CONTENT

1. Introduction

  • Basic Terminology
  • Introduction to Geology
  • Well Planning

2. Well Planning

  • Drilling
  • Pay Section
  • Initial Completion Design

3. Casing Design

  • Completion the Pay Zone
  • Casing String Design
  • Liner Design and Tie-Backs

4. Cementing

  • Properties of Typical Cements
  • Cementing Design
  • Primary Cementing

5. Packer Selection

  • Packer Types
  • Packer Selection and Tubing Forces
  • Special Packers

6. Well Head, Chokes and SSSV’s

  • Wellheads Subsea Wellheads
  • Subsurface Safety Valves and Chokes
  • Hydrate Control

7. Corrosion and Erosion

8. Inflow Performance and Artifical Lift

9. Perforating Guns and Design

WHO SHOULD ATTEND

Production and completion engineers, general petroleum engineers, reservoir engineers, operation engineers, geologist, geophysicists, supervisors, technical managers, and field foremen.

|
Instructor

::

Schedule
::
August 12-14, 2009
::
3 days

Venue
::
Papandayan Hotel
::
Bandung

Tuition Fee
 Rp.
5.250.000,-
  per participant, excluding accommodation & tax.

Registration
::
Send by email -or- fax to:

PT. FOCUS TRACO INDONESIA
Wisma Pakuan, Jl. Pakuan 12
BOGOR – 16143

ph. (021) 7009-9943
  (0251) 2169-150
fax (0251) 7534-984
email This e-mail address is being protected from spambots. You need JavaScript enabled to view it


 

Recommend this article...

 

Training Catalog

Events Confirmed

Share This Page


Today:315
Yesterday:581
This Month:6398
TOTAL:78389
Date Since:Feb 04, 2009